I woke up to another flood in the downstairs. Two more of the couplings blew sometime during the night in the wall in the finished area. I turned off the water and waited for the plumber to arrive.
He got here at 1:00. While he fixed the couplings his young 4th grader who came with him helped me vacuum up the water while mopped. I had to move the love seat and sofa, end table, and footstools. Once he left I tidied up enough for the floor to dry, hung up the wet stuff in the unfinished area, and emptied the bucket.
Then I showered and headed to bookstore at 2:30. I was supposed to be there by 1 to work until 8 tonight. The fist Saturday of the month we have Music on Main from 5 to 9. Businesses are encourage to stay open which we do. The headline band plays from 7 to 9 but we closed at 8.